Major refurbishment of an existing 4 storey office building, with creation of an additional floor and a restaurant on the ground floor.

The extra floor was added by means of a steel structural framework with concrete slab roofing on a collaborative metal form slab. The layout of the additional floor is identical to the existing floors. On the 4th floor, the North-East corner has a 70 m² meeting room with an overhang overlooking the Regional Council building.

The design of the frame and technical facilities make it possible to achieve the Very Good level of the Breeam.

Photos: Pierre COOK

King Charles

Year
Location
Lyon 2ème (69)
Project owner
SCI CHARLEMAGNE CONFLUENCE (CARDINAL INVESTISSEMENT)
Project manager
RAU (mandataire) + SOHO ARCHITECTURE (architecte associé)
Missions

Basis + working designs

Spécificités techniques

The design of the frame and technical facilities make it possible to achieve the high performance level of the Breeam.


500 m² of photovoltaic sensors on terrace. Energy production by heat pump powered by a well.

Surface
10 000 m²
Type
Contruction
Cost of the work
12 000 000 € HT