Bringing the wastewater treatment plant into conformity.

The plant comprises the following structures:
- clarifier with deep mixing foundations
- technical building without pile foundations 
- biological tank
- metering channel
- floating station (degasser)
- industrial water station
- crane foundations
- stormwater outlet D02 

Wastewater treatment plant

Year
Company of civil engineering
DURON
Location
Belleville sur Saône (69)
Project owner
STEU SAONE BEAUJOLAIS
Project manager
CABINET MERLIN
Missions

Working designs

Type
Civil Engineering
Cost of the work
9 960 000 € HT