Pre-stressed concrete box girder bridge, deck constructed from voussoirs cast on site through successive cantilevering.

Structure 785 metres long divided into 10 spans (50.4 + 8 x 85.10 + 54).

Deck support by 9 river piers with pile foundations.

Viaduct over the Loire - Cé bridge on the A 87

Year
Company of civil engineering
ETPO
Location
Angers (49)
Project owner
AUTOROUTES DU SUD DE LA FRANCE
Project manager
ARCADIS
Missions

External verification of deck designs. 

Type
Engineering structures
Cost of the work
29 000 000 € HT