The plant was brought into conformity with the “Urban residual water directive".
This work was carried out on an active Seveso site.





Working designs
Creation of two fast concentrators 15 metres in diameter.
Creation of two digesters 22.60 metres in diameter each.
Creation of a 500 m² technical building
Creation of a 1,130 m² thermylis furnace.