Road bridge consisting of a pre-stressed slab 115 metres long with 5 spans (15 metres, 17 metres, 56 metres, 15 metres, 12 metres).

The main span is supported by a pre-stressed arch with a 42 metre opening.

Very slim structural components.

Scientific creep analysis, consideration and optimisation of the construction phasing, general modelling of the structure using the SETRA PCP software.

3D modelling in AUTOCAD to create the formwork and reinforcement drawings.

(Copyright: Loïc COLONNA - Photos 1-2-3)

New bridge across the Tavignano river

Year
Company of civil engineering
RAZEL BEC (ex CARI)
Location
Altiani - Haute Corse (2B)
Project owner
COLLECTIVITE TERRITORIALE DE LA CORSE
Project manager
SECOA - VIRLOGEUX
Missions

Working designs

Type
Engineering structures
Cost of the work
6 000 000 € HT