Double beam road bridge 268 metres long with 4 main spans.
Tetrapod piers consisting of four reinforced concrete drums inclined longitudinally at approximately 45°, fitted transversely with reinforced concrete tie-rods, and longitudinally with pre-stressed concrete tie-rods (pre-stressed tie-rods of more than 30 metres on pier P1).
Construction of a three-dimensional design model for the entire structure, supports and mixed deck, incorporating the construction phasing.



