Extension of the school to create a deafness unit for the OVE Association.
Photos: Pierre COOK






Basis + Exe
Connected wood/metal flooring. Wall of laminated cross-ply wood panels prefabricated in workshop (thickness 94 mm). Two weeks to assemble and meets anti-seismic requirements.