Cable-stayed bridge 210.5 metres long, single pylon 57 metres high supported by a river pier.
Orthotropic slab deck 27.4 metres wide, 2 assymetric spans 67.2 and 143.3 metres long respectively.
Pylon balanced by anchoring the cable in a solid abutment-pre-stressed by postension in both directions. Abutment is anchored into the rock by means of pre-stressed tie-rods.
Metal deck embedded into the abutment by pre-stressing the nails