Replacement of the 90 tonnes metallic deck on the existing railway structure by a mixed 270 tonnes deck.
Creation of reinforced concrete support stringers connected to the existing masonry.
Addition of a metallic track embedded into the masonry on abutment.
Opening of the abutment masonry walls to allow inspection of the inside of the abutment.
Reinforcement of masonry.
Photos: Pierre COOK





