Construction of an orthotropic slab metallic bridge 293 metres long, with the main span suspended from a concrete/metal arch covering a distance of 149 metres.
The foundations of this structure are on piles for the piers and on supporting masses anchored into the rock for the arch feet.
Photos: Christine CHAUDAGNE





