Construction of an orthotropic slab metallic bridge 293 metres long, with the main span suspended from a concrete/metal arch covering a distance of 149 metres. 

The foundations of this structure are on piles for the piers and on supporting masses anchored into the rock for the arch feet.

Photos: Christine CHAUDAGNE

Bridge across the Maine river

Year
Company of civil engineering
ETPO
Entreprise
BAUDIN CHATEAUNEUF (Métal)
Location
Angers (49)
Project owner
ANGERS LOIRE METROPOLE
Project manager
EGIS JMI - LAVIGNE & CHERON ARCHITECTES
Missions

Working designs

Type
Engineering structures
Cost of the work
22 000 000 € HT