Construction of an industrial process tower (manufacturing of magnetic steel sheets)

Photos: Pierre COOK

Arcelor Mittal

Year
Entreprise
CASTEL & FROMAGET
Location
Saint Chely d'Apcher (48)
Project owner
ARCELOR MITTAL
Missions

Working designs (design calculations for sections and assemblies, layout drawings, details).

Spécificités techniques

- Footprint on the ground 21 x 21 metres.
- Maximum height: 55 metres.
- 7 floor levels with 500 to 1,000 kg/m² of overload + heavy equipment.
- Interior lift over the whole height.
- 12.5 tonnes gantry crane at 50.60 m level.

Surface
2 500 m²
Type
Steel and wood structures